Tuesday, June 23, 2015

Park Avenue Bridge Closed, Matiello Claims Conspiracy

The bridge over the railway line located on Park Avenue has been closed due to serious structural compromise.  Speaker Matiello has taken this as a sign that some conspiracy being afoot, tied to a pending toll bill making its way through the General Assembly.  He claims it is suspect that the bridge was able to pass inspection in September and now has suddenly become problematic.  What he forgot to mention was that the state went through a record-breaking winter that brought in loads of eroding snow and ice.  

No comments:

Post a Comment